1 00:00:13,820 --> 00:00:11,480 Saturn one 1b quarterly film reports 2 00:00:41,740 --> 00:00:13,830 number 20 covers progress during the 3 00:00:44,540 --> 00:00:41,750 period April May and June 1964 a 4 00:00:46,310 --> 00:00:44,550 highlight of this report period was the 5 00:00:49,340 --> 00:00:46,320 launch of the sixth Saturn flight 6 00:00:51,680 --> 00:00:49,350 vehicle si6 this vehicle was the first 7 00:00:54,319 --> 00:00:51,690 to carry an Apollo spacecraft boiler 8 00:00:57,380 --> 00:00:54,329 plate and launch escape system it was 9 00:01:00,200 --> 00:00:57,390 also the first flight to use an st 124 10 00:01:02,840 --> 00:01:00,210 for active guidance DSA six launch 11 00:01:05,420 --> 00:01:02,850 scheduled for May 26th were scrubbed 12 00:01:07,760 --> 00:01:05,430 during countdown due to an environmental 13 00:01:11,990 --> 00:01:07,770 control system compressor malfunction in 14 00:01:14,660 --> 00:01:12,000 the ground facilities equipment two days 15 00:01:17,270 --> 00:01:14,670 later the final countdown began at t 16 00:01:20,210 --> 00:01:17,280 minus 85 minutes a hold was caused by 17 00:01:22,910 --> 00:01:20,220 additional time required for st 124 18 00:01:25,789 --> 00:01:22,920 stabilizer azmuth alignment at t minus 19 00:01:28,100 --> 00:01:25,799 70 minutes a second hold was called due 20 00:01:32,179 --> 00:01:28,110 to a ground facilities valve freezing in 21 00:01:35,420 --> 00:01:32,189 the open position at t minus 41 seconds 22 00:01:38,149 --> 00:01:35,430 a third hold was called because st 124 23 00:01:40,130 --> 00:01:38,159 alignment could not be verified due to 24 00:01:43,249 --> 00:01:40,140 LOX boil off vapor breaking the 25 00:01:45,740 --> 00:01:43,259 theodolite beam the MOSFET line has been 26 00:01:47,480 --> 00:01:45,750 rerouted to a lower level eliminating 27 00:01:53,030 --> 00:01:47,490 the possibility of this condition during 28 00:01:59,209 --> 00:01:53,040 future countdowns the count was recycled 29 00:02:04,760 --> 00:01:59,219 to t-minus 15 minutes at 12:07 p.m. on 30 00:02:04,770 --> 00:02:12,900 [Music] 31 00:02:18,640 --> 00:02:15,850 the performance was as expected for the 32 00:02:20,680 --> 00:02:18,650 first 100 17 seconds of flight at that 33 00:02:22,480 --> 00:02:20,690 time booster engine number 8 shut down 34 00:02:25,570 --> 00:02:22,490 due to a mechanical failure in the 35 00:02:27,520 --> 00:02:25,580 propellant turbopup gearbox sa-7 and 36 00:02:29,770 --> 00:02:27,530 subsequent vehicles will incorporate an 37 00:02:32,140 --> 00:02:29,780 improved propellant turbo pump gearbox 38 00:02:34,060 --> 00:02:32,150 the engine out circuit shut down the 39 00:02:36,400 --> 00:02:34,070 faulty engine and the remaining seven 40 00:02:38,110 --> 00:02:36,410 engines continue to function burning two 41 00:02:40,450 --> 00:02:38,120 and seven ten seconds longer than 42 00:02:42,970 --> 00:02:40,460 programmed partially compensating for 43 00:02:45,010 --> 00:02:42,980 the loss of engine eight the deviation 44 00:02:48,310 --> 00:02:45,020 from the programmed trajectory was 45 00:02:50,800 --> 00:02:48,320 compensated for by the st 124 guidance 46 00:02:53,230 --> 00:02:50,810 system which became active shortly after 47 00:02:56,410 --> 00:02:53,240 second stage ignition prior to this time 48 00:02:58,720 --> 00:02:56,420 an ST 90s stabilized platform system 49 00:03:01,600 --> 00:02:58,730 guided the vehicle starting with the 50 00:03:05,380 --> 00:03:01,610 next flight vehicle only the st 124 will 51 00:03:07,750 --> 00:03:05,390 be used for guidance final booster 52 00:03:10,150 --> 00:03:07,760 cut-off occurred 149 seconds after 53 00:03:13,570 --> 00:03:10,160 liftoff ullage and retro rocket action 54 00:03:15,580 --> 00:03:13,580 was as expected the plight of si6 was 55 00:03:17,710 --> 00:03:15,590 recorded by the standard ground cameras 56 00:03:19,630 --> 00:03:17,720 two television cameras plus eight 57 00:03:21,940 --> 00:03:19,640 onboard movie cameras which you see 58 00:03:23,979 --> 00:03:21,950 returning to Earth these cameras were 59 00:03:28,800 --> 00:03:23,989 successful in recording flight data such 60 00:03:32,979 --> 00:03:28,810 as aerodynamic effect on blowout panels 61 00:03:37,000 --> 00:03:32,989 opening up the blowout panels rocks 62 00:03:42,460 --> 00:03:37,010 sloshing in the center LOX tank s4 63 00:03:44,110 --> 00:03:42,470 engine chill down stage separation s4 64 00:03:46,420 --> 00:03:44,120 stage ignition and performance were 65 00:03:48,520 --> 00:03:46,430 successful placing the SI six satellite 66 00:03:50,920 --> 00:03:48,530 consisting of the emptied s for stage 67 00:03:53,410 --> 00:03:50,930 instrument unit and Apollo boilerplate 68 00:03:55,840 --> 00:03:53,420 into an earth orbit lasting three and 69 00:03:58,479 --> 00:03:55,850 3/10 days as a result of good 70 00:04:01,150 --> 00:03:58,489 performance for their say 5 and si 6 s 71 00:04:03,460 --> 00:04:01,160 for stage helium heater backup hardware 72 00:04:08,259 --> 00:04:03,470 and excess fuel will be eliminated from 73 00:04:10,870 --> 00:04:08,269 future vehicles saving 1500 pounds on 74 00:04:13,180 --> 00:04:10,880 May 28 the booster and instrument unit 75 00:04:15,370 --> 00:04:13,190 for the seventh flight vehicle si 7 76 00:04:17,260 --> 00:04:15,380 departed the Marshall Center aboard the 77 00:04:20,380 --> 00:04:17,270 barge promised and arrived at Cape 78 00:04:22,190 --> 00:04:20,390 Kennedy ten days later on June night the 79 00:04:26,630 --> 00:04:22,200 booster s17 80 00:04:27,830 --> 00:04:26,640 was erected at launch complex 37b also 81 00:04:29,870 --> 00:04:27,840 by the night of June 82 00:04:31,760 --> 00:04:29,880 both the Apollo service module and the 83 00:04:35,000 --> 00:04:31,770 command module had arrived at the Cape 84 00:04:37,010 --> 00:04:35,010 by air from the West Coast following a 85 00:04:38,720 --> 00:04:37,020 successful accept inspiring and final 86 00:04:41,270 --> 00:04:38,730 checkout earlier in the quarter the 87 00:04:44,350 --> 00:04:41,280 second stage s for seven was flown from 88 00:04:46,610 --> 00:04:44,360 sacto to the Cape arriving on June 12th 89 00:04:48,770 --> 00:04:46,620 receiving inspection and preliminary 90 00:04:50,690 --> 00:04:48,780 checks on the stage were completed and 91 00:04:55,190 --> 00:04:50,700 the stage was erected at the launch 92 00:04:58,760 --> 00:04:55,200 complex on June 19th four days later on 93 00:05:01,070 --> 00:04:58,770 June 23rd the instrument unit s iu7 94 00:05:03,560 --> 00:05:01,080 was also moved to the launch complex and 95 00:05:06,170 --> 00:05:03,570 directed following mating of the stages 96 00:05:09,800 --> 00:05:06,180 and free flights checkout sa-7 is 97 00:05:12,170 --> 00:05:09,810 scheduled to be launched next quarter at 98 00:05:14,540 --> 00:05:12,180 Marshalls quality laboratory the booster 99 00:05:16,790 --> 00:05:14,550 for the night flight vehicle sa 9 is 100 00:05:19,490 --> 00:05:16,800 undergoing post static checkout in the 101 00:05:21,410 --> 00:05:19,500 pressure test cell following testing the 102 00:05:23,720 --> 00:05:21,420 stage will undergo electrical check out 103 00:05:27,380 --> 00:05:23,730 prior to preparation for shipment to the 104 00:05:30,290 --> 00:05:27,390 Cape early this quarter at Michou 105 00:05:32,480 --> 00:05:30,300 following pre static check out the s18 106 00:05:35,360 --> 00:05:32,490 was prepared by Chrysler for shipment to 107 00:05:37,640 --> 00:05:35,370 Marshall on April 17th the booster stage 108 00:05:39,260 --> 00:05:37,650 was loaded on the barge promise the 109 00:05:41,180 --> 00:05:39,270 stage was shipped from Michou the same 110 00:05:46,190 --> 00:05:41,190 day and arrived at Marshall on April 111 00:05:48,470 --> 00:05:46,200 26th at MSFC the booster was erected in 112 00:05:50,930 --> 00:05:48,480 the static test stand and Static firing 113 00:05:53,690 --> 00:05:50,940 preparations were begun a short duration 114 00:05:55,550 --> 00:05:53,700 firing was scheduled for May 21st but 115 00:05:57,620 --> 00:05:55,560 was rescheduled when a leak developed 116 00:06:05,600 --> 00:05:57,630 around the manhole cover in the center 117 00:06:07,760 --> 00:06:05,610 locks tank later the state successfully 118 00:06:11,090 --> 00:06:07,770 completed two separate static firings 119 00:06:14,900 --> 00:06:11,100 one for 45 seconds on May 26th the other 120 00:06:18,110 --> 00:06:14,910 for 143 seconds on June 11th on June 121 00:06:21,020 --> 00:06:18,120 24th s18 was shipped back to me Shu 122 00:06:25,780 --> 00:06:21,030 arriving on June 28th modification and 123 00:06:31,190 --> 00:06:28,400 also at Marshalls Michou operations 124 00:06:33,680 --> 00:06:31,200 checkout of the Chrysler built s 110 125 00:06:36,140 --> 00:06:33,690 began on May 4th and will be completed 126 00:06:38,120 --> 00:06:36,150 early next quarter following completion 127 00:06:42,550 --> 00:06:38,130 check out the booster we'll be prepared 128 00:06:46,040 --> 00:06:42,560 for shipment to MSFC next report period 129 00:06:48,770 --> 00:06:46,050 ad uh mrs. satty Monica facility s for 130 00:06:51,740 --> 00:06:48,780 nine checkout was completed April 28 on 131 00:06:54,740 --> 00:06:51,750 May 8 the stage was shipped to Sacto and 132 00:06:56,720 --> 00:06:54,750 installed in the static test and s for 9 133 00:07:01,460 --> 00:06:56,730 acceptance firing is scheduled during 134 00:07:04,220 --> 00:07:01,470 the next quarter meanwhile on April 25th 135 00:07:06,380 --> 00:07:04,230 the s for 8 was moved from da C's 136 00:07:09,050 --> 00:07:06,390 assembly area to the vertical checkout 137 00:07:12,020 --> 00:07:09,060 area checkout hampered because of parts 138 00:07:14,830 --> 00:07:12,030 shortages is now underway no major 139 00:07:18,470 --> 00:07:14,840 problems have been encountered to date 140 00:07:21,380 --> 00:07:18,480 also at santa monica stage assembly of 141 00:07:26,150 --> 00:07:21,390 Douglass's s410 stage continued during 142 00:07:28,040 --> 00:07:26,160 the quarter and is on schedule vibration 143 00:07:30,470 --> 00:07:28,050 testing by wiley laboratories of the 144 00:07:32,780 --> 00:07:30,480 first unpressurized designed instrument 145 00:07:35,210 --> 00:07:32,790 unit was completed during this report 146 00:07:37,370 --> 00:07:35,220 period minor modifications made in this 147 00:07:40,340 --> 00:07:37,380 unit as a result of testing will be 148 00:07:43,340 --> 00:07:40,350 incorporated on flight units siu 9 8 and 149 00:07:45,170 --> 00:07:43,350 10 completion of siu 9 component 150 00:07:47,630 --> 00:07:45,180 installation and beginning of check out 151 00:07:51,860 --> 00:07:47,640 at MSFC is scheduled for early next 152 00:07:54,200 --> 00:07:51,870 quarter on june 15th siu 8 structure was 153 00:07:56,060 --> 00:07:54,210 removed from storage and transferred to 154 00:07:58,910 --> 00:07:56,070 the manufacturing engineering laboratory 155 00:08:01,460 --> 00:07:58,920 for a component installation check out 156 00:08:02,150 --> 00:08:01,470 of SIU 8 is scheduled to start late next 157 00:08:05,000 --> 00:08:02,160 quarter 158 00:08:08,720 --> 00:08:05,010 SIU 10 is in storage awaiting start of 159 00:08:11,570 --> 00:08:08,730 component assembly next quarter a May 160 00:08:13,760 --> 00:08:11,580 20th at MSF sees test laboratory the 161 00:08:16,220 --> 00:08:13,770 complete dynamic test vehicle in the SI 162 00:08:18,770 --> 00:08:16,230 9 8 and 10 configuration had been 163 00:08:21,650 --> 00:08:18,780 installed into the test tower the upper 164 00:08:24,200 --> 00:08:21,660 stage dynamic test for the SI 9 8 and 10 165 00:08:26,510 --> 00:08:24,210 configuration which tested only the s 166 00:08:29,210 --> 00:08:26,520 for stage instrument unit Apollo 167 00:08:31,850 --> 00:08:29,220 boilerplate and micrometeoroid capsule 168 00:08:33,650 --> 00:08:31,860 was completed last quarter the complete 169 00:08:35,210 --> 00:08:33,660 vehicle test continued throughout this 170 00:08:43,570 --> 00:08:35,220 quarter and is scheduled for completion 171 00:08:49,310 --> 00:08:46,400 at Monsieur chrysler fabrication and 172 00:08:51,890 --> 00:08:49,320 assembly of the s1 b1 thrust structure 173 00:08:56,330 --> 00:08:51,900 assembly and second stage adapter were 174 00:09:02,120 --> 00:08:56,340 completed in May on June 19th clustering 175 00:09:04,460 --> 00:09:02,130 began on s1 b1 the first six h1 flight 176 00:09:06,560 --> 00:09:04,470 engines operated to two hundred thousand 177 00:09:09,410 --> 00:09:06,570 pounds thrust were delivered to Michou 178 00:09:11,810 --> 00:09:09,420 during this quarter s 1 b1 will be the 179 00:09:15,770 --> 00:09:11,820 first stage using the operated h1 180 00:09:18,140 --> 00:09:15,780 engines in mid-june fabrication began on 181 00:09:21,500 --> 00:09:18,150 the second stage adapter spider beam for 182 00:09:23,660 --> 00:09:21,510 s1 b2 the barrel assembly for this stage 183 00:09:27,850 --> 00:09:23,670 was completed during this report period 184 00:09:32,750 --> 00:09:30,740 meanwhile the s-1 B mock-up then was 185 00:09:34,760 --> 00:09:32,760 completed the fin which can be mounted 186 00:09:36,590 --> 00:09:34,770 on the tail section mock-up will 187 00:09:38,300 --> 00:09:36,600 generally be used as a development 188 00:09:41,630 --> 00:09:38,310 fixture for routing of plumbing and 189 00:09:43,880 --> 00:09:41,640 wiring during this quarter at nishu 190 00:09:45,920 --> 00:09:43,890 construction work for s1 b test 191 00:09:48,380 --> 00:09:45,930 facilities included a concrete block 192 00:09:50,180 --> 00:09:48,390 building housing the air compressor for 193 00:09:52,250 --> 00:09:50,190 the computer facility and brick and 194 00:09:56,450 --> 00:09:52,260 mortar construction on the card taped 195 00:09:59,450 --> 00:09:56,460 storage building at the close of last 196 00:10:01,550 --> 00:09:59,460 quarter the s4 be structural and dynamic 197 00:10:03,530 --> 00:10:01,560 test stages were in Douglass's vertical 198 00:10:06,280 --> 00:10:03,540 assembly towers at Huntington Beach 199 00:10:10,340 --> 00:10:08,750 early this quarter the structural test 200 00:10:12,410 --> 00:10:10,350 stage was moved from its assembly 201 00:10:14,390 --> 00:10:12,420 position and transferred to the 202 00:10:16,760 --> 00:10:14,400 structural test building where strain 203 00:10:19,070 --> 00:10:16,770 gauges and other instrumentation devices 204 00:10:20,870 --> 00:10:19,080 were installed in preparation for the 205 00:10:24,140 --> 00:10:20,880 hydrostatic portion of the structural 206 00:10:25,970 --> 00:10:24,150 test program on June 23rd the finished 207 00:10:28,520 --> 00:10:25,980 stage was moved into the hydrostatic 208 00:10:30,980 --> 00:10:28,530 tower hydrostatic pressure testing of 209 00:10:33,580 --> 00:10:30,990 the locks and lh2 tank is scheduled to 210 00:10:35,990 --> 00:10:33,590 begin in mid-july 211 00:10:38,420 --> 00:10:36,000 assembly of the propellant tanks for the 212 00:10:40,670 --> 00:10:38,430 s4 be dynamic stage was completed in 213 00:10:42,530 --> 00:10:40,680 March the stage was then moved to the 214 00:10:45,110 --> 00:10:42,540 hydrostatic test tower during 215 00:10:47,720 --> 00:10:45,120 hydrostatic test operations on the s4 be 216 00:10:49,790 --> 00:10:47,730 dynamic stage a valve controller in the 217 00:10:51,829 --> 00:10:49,800 facilities test equipment malfunctioned 218 00:10:54,050 --> 00:10:51,839 causing a negative pressure in the 219 00:10:56,569 --> 00:10:54,060 liquid hydrogen tank which resulted in 220 00:10:58,400 --> 00:10:56,579 depressions in the lh2 dome 221 00:11:00,410 --> 00:10:58,410 depressions were later popped out by 222 00:11:02,989 --> 00:11:00,420 filling the tank with water during 223 00:11:05,660 --> 00:11:02,999 inspection cracks were found in two weld 224 00:11:07,549 --> 00:11:05,670 seams these cracks were repaired and the 225 00:11:10,460 --> 00:11:07,559 stage has been successfully retested 226 00:11:12,679 --> 00:11:10,470 staged insulation installation was begun 227 00:11:16,819 --> 00:11:12,689 late this quarter and is expected to be 228 00:11:19,910 --> 00:11:16,829 completed early next quarter during this 229 00:11:22,100 --> 00:11:19,920 report period the s4 be all system stage 230 00:11:24,350 --> 00:11:22,110 was processed through assembly towers 231 00:11:26,869 --> 00:11:24,360 one and two we're welding of the LOX 232 00:11:29,840 --> 00:11:26,879 tank assembly and the lh2 forwards dome 233 00:11:31,400 --> 00:11:29,850 to the lh2 cylinder was accomplished the 234 00:11:36,919 --> 00:11:31,410 stage was then installed in the 235 00:11:39,199 --> 00:11:36,929 hydrostatic Tower a DAC Sacramento test 236 00:11:41,239 --> 00:11:39,209 facility final inspection of facility 237 00:11:43,429 --> 00:11:41,249 contractor effort at the Gama complex 238 00:11:46,009 --> 00:11:43,439 test control center and instrumentation 239 00:11:48,319 --> 00:11:46,019 center has been completed completion of 240 00:11:50,989 --> 00:11:48,329 the entire Gama complex including test 241 00:11:52,819 --> 00:11:50,999 cells has been temporarily delayed due 242 00:11:55,819 --> 00:11:52,829 primarily to late delivery of 243 00:11:58,249 --> 00:11:55,829 approximately 65 valves of various sizes 244 00:12:02,659 --> 00:11:58,259 and types inspection and testing of 245 00:12:05,059 --> 00:12:02,669 these valves is now underway also at SAC 246 00:12:06,949 --> 00:12:05,069 toes bata complex installation of 247 00:12:09,889 --> 00:12:06,959 instrumentation at beta test stands 248 00:12:11,569 --> 00:12:09,899 number one is complete the j2 engine for 249 00:12:13,579 --> 00:12:11,579 use in the battleship program was 250 00:12:15,609 --> 00:12:13,589 received in April checked out and 251 00:12:18,199 --> 00:12:15,619 subsequently attached to the stage 252 00:12:20,389 --> 00:12:18,209 preparation for cold flow testing of the 253 00:12:23,539 --> 00:12:20,399 battleship stage began the first week in 254 00:12:25,699 --> 00:12:23,549 June construction continued at beta test 255 00:12:27,919 --> 00:12:25,709 stands number three scheduled to be 256 00:12:30,499 --> 00:12:27,929 completed next quarter the stand will be 257 00:12:34,159 --> 00:12:30,509 used in testing the s4b all systems 258 00:12:35,600 --> 00:12:34,169 stage the liquid hydrogen test tank will 259 00:12:37,340 --> 00:12:35,610 be transferred next quarter from 260 00:12:39,710 --> 00:12:37,350 Marshalls manufacturing engineering 261 00:12:41,590 --> 00:12:39,720 laboratory to the test laboratory for 262 00:12:43,879 --> 00:12:41,600 additional technological testing 263 00:12:46,220 --> 00:12:43,889 insulation was installed in the tank 264 00:12:47,960 --> 00:12:46,230 during this report courier the container 265 00:12:50,479 --> 00:12:47,970 will be used in the study of super 266 00:12:54,829 --> 00:12:50,489 insulation for liquid hydrogen and LOX 267 00:12:57,289 --> 00:12:54,839 tanks also at Marshalls manufacturing 268 00:12:59,449 --> 00:12:57,299 engineering laboratory installation of 269 00:13:02,179 --> 00:12:59,459 some components is underway under Saturn 270 00:13:04,369 --> 00:13:02,189 1b instrument unit vibration test unit 271 00:13:06,619 --> 00:13:04,379 work is scheduled to be completed in 272 00:13:08,090 --> 00:13:06,629 early August then the unit will be 273 00:13:09,780 --> 00:13:08,100 prepared for shipment to Wiley 274 00:13:13,680 --> 00:13:09,790 Laboratories on August 30 275 00:13:15,990 --> 00:13:13,690 first for vibration testing fabrication 276 00:13:18,150 --> 00:13:16,000 is complete on the Saturn 1b and Saturn 277 00:13:20,250 --> 00:13:18,160 5 instrument unit for the dynamic test 278 00:13:22,200 --> 00:13:20,260 vehicle the unit will be in storage 279 00:13:24,630 --> 00:13:22,210 until August 10th when it will be 280 00:13:26,280 --> 00:13:24,640 transferred to the test site results of 281 00:13:28,530 --> 00:13:26,290 vehicle dynamic testing will furnish 282 00:13:39,510 --> 00:13:28,540 necessary data influencing control 283 00:13:41,430 --> 00:13:39,520 computer filter design a significant 284 00:13:44,250 --> 00:13:41,440 highlight of this report period was the 285 00:13:46,500 --> 00:13:44,260 gimbley of rocky tines j2 liquid rocket 286 00:13:49,020 --> 00:13:46,510 engine during the tests the engine was 287 00:13:50,760 --> 00:13:49,030 gimballed at 30 degrees per second in 288 00:13:53,700 --> 00:13:50,770 billing was programmed through three 289 00:13:57,090 --> 00:13:53,710 cycles in both phases to a maximum of 10 290 00:14:02,610 --> 00:13:57,100 degrees these hot firings met all PF RT 291 00:14:05,160 --> 00:14:02,620 requirements in April the s4b battleship 292 00:14:05,580 --> 00:14:05,170 hot-fire j2 engine was turned over to 293 00:14:08,010 --> 00:14:05,590 NASA